The week of 8/18/08 was the week of the Plumber. We have had a very dry August, and this week was no exception - and it was hot, too. He worked almost every day onsite to get the bathroom roughed in, the laundry roughed in and the gas lines in place before they came out to pour the slab floors in the living room extension and back hallway addition. You can see the gas line sticking up from the back living room addition where the gas log fireplace will be located.

The well was going to be relocated during this week, but it was pushed back so that the concrete trucks could pour the floor with ease and not disturb the new well location. The existing well has to be moved b/c it needs to be further from the structure. We have never had a problem with our well over the past nine years, but getting a new one will be a nice addition to update the property. It will be located only about 10ft away from the existing well in the backyard.